LINGZHI factory campus, Guangdong

Women's knitwear manufacturer · Guangdong, China · est. 2008

We make women's
tees for brands.

One building for knitting, cutting, printing, QC and export. 109 graded styles, 825 live SKUs, 12 print techniques — and a merchandiser who replies within 12 working hours.

12,000m² under one roof
250kPcs / month
825Live SKUs
50Pcs MOQ / colour
OEKO-TEX® Standard 100BSCI auditedISO 9001 : 2015 SGS testedGOTS on requestAQL 2.5 inspection

Modern supply chain · one building

From yarn
to your dock.

Fabric in, finished cartons out — no outsourced middle steps. Every stage is on our floor, under our QC and photographed before it ships.

12,000m² floor
180Machinists · 3 lines
3.2MPieces / year
15–20Days bulk lead
Capacity

250,000 pcs / month across three lines. We hold 400+ stock fabric rolls and 12 stock colours for same-week sampling.

  • Cutting: 2 automatic cutters
  • Sewing: 128 stations, 12 per line
  • Printing: 2 carousels + manual press
Engineering

Tech pack in 48 hours. Pattern room, grading and marker making are in house, so fit changes never wait on a third party.

  • 2 pattern makers + 1 grader
  • clo3D / Excel / paper patterns
  • Sampling: 7 days, one fit round included
Compliance & logistics

AQL 2.5 on every lot, photo report per carton, and FOB / CIF / DDP options from Shenzhen or Guangzhou.

  • OEKO-TEX, BSCI, ISO 9001, SGS
  • Air 5–8 days · sea 25–35 days
  • Woven label, hangtag, polybag, carton marks

What we make

Seven categories,
one floor.

All 109 styles

From the catalogue

Styles buyers
start with.

Browse all

Printing · step by step

How a print
actually gets made.

Four steps, all in house. We send you a photo of the strike-off before the bulk run starts — no surprises on colour.

Colour separation and artwork film01
Colour separation

Your artwork is separated into spot colours and output as film positives — registration marks included.

Screen exposure02
Screen exposure

Emulsion-coated mesh is burned with UV. One screen per colour, burned and washed out in our darkroom.

Pulling the squeegee03
Pull the squeegee

Ink is pushed through the mesh by hand or carousel. Water-based for softness, plastisol for opacity.

Curing tunnel04
Cure & check

Each layer is cured before the next. We wash-test 3 pcs and photograph the strike-off for approval.

Printed graphic detail on cotton
Fig. 02 — two-colour print on 240 GSM cotton, raking lightPrinted in house

How an order runs

Six steps,
no surprises.

Start an order
01

Inquiry

Styles, quantities, target FOB and market.

Reply in 12h
02

Quote & tech pack

Costed BOM, print options, graded spec sheet.

48 hours
03

Sampling

Proto + fit round, strike-off photos before shipping.

7 days
04

Approval

Fit, colour and print signed off with a sealed sample.

2 days
05

Bulk

Cut, sew, print, wash, press — tracked per lot.

15–20 days
06

QC & ship

AQL 2.5, photo report, carton marks, air or sea.

3 days

Inside the building

The floor,
not a stock photo.

Factory & QC
Sewing hall from the mezzanine Finished goods on rails Finished tees, flat lay
Cutting2 automatic cutters · 12 m spreading table · marker made in house
Sewing128 stations across 3 lines · 12 machinists per line · single-style flow
Printing2 automatic carousels (8 colours) · 1 manual press · in-house strike-offs
FinishingHeat press · 3-thread overlock · coverstitch · bar-tack · trimming
QCAQL 2.5 by lot · light box · measurement table · metal detection

More views

The plant,
from every angle.

Factory & QC

Who we produce for

40+ labels,
most under NDA.

DTC brands, department-store private labels and licensing programmes across the EU, UK, US and Japan.

Brand AMaison NordStudio 14Atelier KNorthboundRue 9

Request a quote

Tell us what
you need made.

Five answers get you a costed reply — fabric, print, MOQ and lead time — within 12 working hours.

Emailanoryutao@163.com
ResponseWithin 12 working hours
FactoryGuangdong, China
LanguagesEN · 中文 · ES
Received. A merchandiser will reply within 12 working hours.